If you run a silo, this is the page. Full pneumatic loads of Grade 100 slag cement, blown in on your schedule, priced by the load and translated into cost per yard so you can see what the replacement is worth before you order.
Same-day turnaround during business hours.
A ton of slag cement is not a ton of portland, because it goes into the mix at a different rate and does a different job. The honest comparison is cost per cubic yard.
TxDOT Item 421 allows 35 to 50 percent of portland to be replaced with slag cement, and up to 70 percent in mass placements. At 564 lb of cementitious per yard, a 40 percent replacement is about 225 lb of slag per yard, so one 25-ton load covers roughly 220 yards.
Slag cement generally prices under portland in Houston because it is ground from a byproduct. When it does not, the reason is freight or allocation, and we will tell you which.
Expect slightly slower set and early strength, then higher 28 and 56 day strength, lower heat, lower permeability, better sulfate and chloride resistance. Plan finishing and stripping around that.
Slag cement concrete cures lighter. Architectural and exposed work often specifies it for that reason alone. It can also show a temporary greenish tint at stripping that fades with air exposure.
How the loads move.
| Detail | What to expect |
|---|---|
| Load size | About 25 tons, bulk pneumatic tanker |
| Unloading | Blown into your silo or pig; have the fill line clear and the silo vent working |
| Minimum | Full loads; under 20 tons is a shortload with a shortload fee |
| Scheduling | Standing weekly loads or call-in; standing orders get priority when the grinder is tight |
| Paperwork | Mill certificate with fineness and SO3, producer code for submittals, SDS |
| Lead time | Next-day for the Houston metro, subject to producer availability and trucking |
| Terms | Standard commercial terms |
Silo discipline matters more with slag. Slag cement is ground finer than most portland and flows differently. Do not blend it into a portland silo unless the plant is set up for it. A dedicated silo or pig keeps the mix design honest and keeps the certificate meaningful.
Standing weekly loads into a dedicated silo for a house mix at 25 to 50 percent replacement. Cost per yard is the whole conversation.
Lower heat and a lighter finish, with strength that keeps climbing. Slag at 30 to 40 percent is common in architectural precast.
Mats, foundations and drilled shafts on industrial and petrochemical work. Up to 70 percent slag under TxDOT rules to hold heat down.
Slag cement plus a small lime dose for sulfate clay. Different dosage, different page: slaglimestabilization.com.
On high-sulfate clay, 5 percent slag cement with 1 percent lime is the TxDOT-researched answer. Same material, delivered dry to the jobsite instead of the silo.
Standing loads and call-ins across greater Houston. Statewide bulk delivery is covered at texasslagcement.com.
At a typical 564 lb of cementitious per cubic yard and 40 percent slag replacement, about 225 lb of slag per yard, so a 25-ton load covers roughly 220 yards. At 30 percent replacement, about 300 yards. Send your mix and we will run your number.
Only if the plant is set up to blend at the scale. Most producers run a dedicated silo or pig for slag so the mix design and the mill certificate stay meaningful. We can advise on the setup.
Slightly, especially in cool weather and at high replacement levels. Early strength is a little lower, 28-day strength is usually higher. Plan finishing and form stripping around it, or use an accelerator when the schedule requires.
Full pneumatic tanker loads of about 25 tons. Under 20 tons is a shortload and carries a shortload fee.
We supply from a Houston producer on the TxDOT Slag Cement Material Producer List under DMS-4620, Grade 100 or better, and confirm the producer code with every quote.
Loads per week, silo, delivery point. A load price back today.